Task at Hand

Admixture for precast concrete is needed to achieve  initial strength 17 MPa at 12 hours (cured in ambient temperature) and concrete shall be workable for 90 min with slump not less than 150 mm moreover ambient temperature is ranging between 25 to 15 during February. 

DCP SOLUTION

DCP team get the mix design and raw material to develop needed product finally we came up with product which can achieve the requirements (PC353) testing result summary is attached.

For more information on the case study, download the attached file. You can find it right under "Project Info". Follow us on social media for more interesting case studies!